At Steve Reiff, Inc., we operate an expansive and well-equipped facility, making us uniquely capable of blasting and painting extremely large-scale fabrications both economically and on a quick-turn basis.

We gave the frac tanks shown here their clean, durable, and oil field tolerant finish here at our plant. Featuring dimensions of 44′ in length x 8′ in width and 12′ in height, we cleaned and steel grit blasted them following a defined set of protocols that satisfied the demands of ASTM d-4417 for the blast profile and SSPC-VIS-1 for blast cleanliness. After removing all traces of dirt, oil, grease, weld spatter, and blast debris, we applied a quick dry thick film liner to the interiors to provide protection against aggressive chemical and fume exposure. The exteriors were given a high gloss, impact-, abrasion- and chemical-resistant coating with outstanding wear properties.

Multiple inspection procedures ensured the coatings were to the required thickness and that no pinholes, holidays, bare spots, or thin points existed. Once completed, the tanks were dressed out and inspected according to our defined quality plan. Each tank took from 2-3 days to process to completion. We met the customer’s high expectations, and currently process 7-14 new and/or used tanks on a weekly basis.

If you are interested in learning more about this project or the processes and products we used to complete it, contact us today

Frac Tank Project Highlights

Project Name

Frac Tanks

Project Description

Interior and exterior blasting and painting of a frac tank.

Capabilities Applied/Processes

Primary:
Steel Grit Blasting (Interior & Exterior)

Secondary:
Lining of Interior
Applied Coating to Exterior

Equipment Used to Manufacture Part

Pirate Brand 600 lb. Blasting Pot, Airless Spray Equipment

Overall Part Dimensions

44′ L x 8′ W x 12′ T

Material Used

Carboline 8845 Urethane
Carboline 310 Liner

Industry for Use

Oil/Fracking

In Process Testing/Inspection Performed

ASTM d-4417 Blast Profile
SSPC-VIS-1 Blast Cleanliness

SSPC-PA2 DFT
Inspection Reports

Volume

5-10 New Tanks Per Week
2-4 Used Tanks Per Week

Delivery/Turnaround Time

2-3 Days

Delivery Location

Texas

Standards Met

Customer and Paint Product Specification Met